Fire system testing scheduled in campus buildings through May 18

Plant Services will be conducting fire system testing in each of the buildings on campus now through Friday, May 18. The testing does not take long, but the horns will sound for brief periods of time. Evacuation is not necessary during the test.

Thank you for your patience.

Comments are closed.